Morrisons, Tynemouth

Being the Main Contractor for this project, we were empowered to manage all direct sub-contractors, as well as our own sub-contract teams.

Overview

Client:

Morrisons

Location:

Tynemouth

Project:

New home shopping pod

Value:

£650k

Duration:

10 weeks

The Brief

Act as the Main Contractor for the project and manage all direct sub-contractors involved in the work. Excavate part of the existing car park and surrounding area in order to create space for a new home shopping pod. Oversee and construct the new shopping pod structure and install internal cold rooms, click and collect lockers, distribution area, fencing, signage and connection to existing sales floor.

The Scope

  • Excavate part of existing car park
  • Install new drainage system
  • Construct new steel-framed shopping pod structure
  • Oversee and install cladding, roof works and glazing
  • Install new internal cold rooms and freezer
  • Create a new connection through to the existing sales floor
  • Construct a new van loading canopy
  • Install new surrounding fencing
  • Oversee new car park layout, landscaping and tarmac works
  • Install new signage

The Results

We acted as the Main Contractor for this scheme and oversaw the entire project from start to finish. As a result we achieved a new shopping pod structure that will enable Morrisons to further the rollout of their home delivery service. We oversaw the construction and installation of the main steel frame building as well as the new drainage system, tarmac works, glazing, landscaping and other works. The project was a challenging one, as the works were carried out from the ground up at the beginning of January in far from ideal weather conditions, however, this new-build project was delivered on time and on budget within a live working environment.